Machine learning-based multi-objective optimization of smart irrigation of urban trees in Arizona
Published 1 Mar 2026 · Added to radar 5 Nov 2026
Details pending
We have indexed the bibliographic record, but a source abstract was not available. Use the original or DOI link below while this record is being enriched.